Step backTable of contents

dW relay for converter brake

Terminal connection diagram
Test steps
Notice: variable signal
 Print page

Page back

Terminal connection diagram

Test steps

  1. Replace dW relay by a new one, or after removing the relay, measure the resistance directly between the winding contacts 85 and 86.
    RTarget = 285-310 Ω.
  2. Open S2 plug connection.
    For the following steps, bring one test probe of the ohmmeter into contact with the vehicle ground. Measure resistance at corresponding contact of cable 2.
    RTarget = 285-310 Ω.
    If R = RTarget, continue with 4.
  3. S3 socket connection: Measure resistance at supply cable to the winding start of the dW relay (pin contact 86).
    RTarget = 285-310 Ω.
  4. S3: Measure resistance at supply cable to winding end of the dW relay (pin contact 85) and ground point M.
    RTarget = 0 Ω.

Notice: variable signal

The assignment to a connection of the transmission control unit is accomplished in the data record and is vehicle-specific.



© by Voith Turbo GmbH & Co. KG
send remarks to markus.zwickel@voith.com (documentation department)