Step backTable of contents

Engine control unit - VDO E-gas

Terminal connection diagram
Test steps
See also:
 Print page

Page back

Terminal connection diagram

Test steps

  1. Open S2 plug connection (cable 2).
    Measure resistance between contact 41 and corresponding contact at engine control unit (PWM output).
    RTarget = 0 Ω.
  2. Check resistance of contact 41 (cable 2) to vehicle ground.
    RTarget = ∞ Ω.

See also:

Engine control unit test - CAN SAE J1939 / IES


© by Voith Turbo GmbH & Co. KG
send remarks to markus.zwickel@voith.com (documentation department)